ACORD 147: Installation and Builders Risk Section.

The section used to organize installation or builders risk project information, including the project, values, parties, site, construction, schedule, and requested coverage structure.

The fillable PDF is available through ACORD's licensed portal. This page is a preparation guide, not a hosted download.

Form numberACORD 147
Edition shown in index2016/03
Source reviewed2026-08-24
Electronic fillable PDF access

Get the ACORD 147 PDF.

Already have an eligible ACORD account? Open the Forms Portal and search for form 147. Check the edition your intended market accepts before completing it. An ACORD account and eligible Forms program are required.

Need help identifying the form or access path? Request access help from Hedge. This is a request for assistance, not an instant download or an insurance submission.

Do not include insured information or upload risk files in a form request.
ACORD 147 details

How the form is used.

What is ACORD 147 used for?
The section used to organize installation or builders risk project information, including the project, values, parties, site, construction, schedule, and requested coverage structure.
Is ACORD 147 editable?
Yes. Request access help from Hedge or choose the electronic fillable PDF in ACORD's licensed Forms Portal.
Which edition is shown?
2016/03 was observed in ACORD's index on 2026-08-24. The intended market decides what it accepts.
Does Hedge host the PDF?
No. Hedge explains the form and links to ACORD's licensed source.
Before completing ACORD 147

Describe the project from start through completion.

Preparation guidance from Hedge. Follow the instructions in the accepted form edition and the intended market's requirements.

  1. Separate existing structure values, work to be completed and other requested values rather than providing one unexplained total.
  2. Document the start date, work already completed, project schedule and expected completion date.
  3. Explain site protection, storage, water-damage controls and other conditions relevant to the construction phase.
Illustrative preparation example

What a clearer packet looks like.

A renovation has already started when insurance is requested. State the original start date, completed work and remaining scope. Describing it as a new project beginning on the requested effective date would leave a material fact unexplained.

Hypothetical example, not a placement result or a coverage determination.

Builders risk vs. ongoing property

ACORD 147 supports installation or construction review. ACORD 140 supports property review. Explain existing structures and occupied portions so the intended market can determine the appropriate application and coverage approach.

Read the ACORD 140 guide
Information organized

Facts to prepare.

  • Project description and location
  • Existing structure and completed values
  • Hard costs, soft costs, and delay exposures
  • Construction type and protection
  • Start date and completion schedule
Quality control

Review before using the form.

  • Separate renovation values from existing structure values
  • Identify work already completed
  • Explain security, water damage, wind, wildfire, and theft controls
Edition, rights, and market boundary

The edition shown is the edition observed in the official index on the review date. Confirm the acceptable edition, jurisdiction, and related forms with the intended market. Hedge links to ACORD's licensed download source and does not host or redistribute the ACORD file.

Related Hedge forms

Hedge-owned supplements that may add class detail.

These fillable Hedge resources can support preparation but do not replace a required ACORD or market-specific application.

Construction

Hedge Builders Risk Supplemental

A fillable Hedge supplemental for new construction and renovation builders risk accounts.

View form and fillable PDF →
Common questions

Use ACORD 147 correctly.

Where can I get help accessing the editable ACORD 147 PDF?

Request ACORD 147 from Hedge for help identifying the current edition and an authorized access path, or use ACORD's official Forms Portal. Hedge does not host or redistribute the ACORD PDF.

What information does ACORD 147 collect?

Project description and location; Existing structure and completed values; Hard costs, soft costs, and delay exposures; Construction type and protection; Start date and completion schedule.

Is edition 2016/03 accepted by every market?

No. That is the edition observed in ACORD's index on the source-review date. Confirm the edition, jurisdiction, related forms, and any market-specific application before releasing the packet.

Sources

Verify against the publisher.

Official source

ACORD Forms Index

Use the official source to confirm form availability, edition, jurisdiction, licensing, and related-form information.

Open official source →
Official source

ACORD Forms Portal

Use the official source to confirm form availability, edition, jurisdiction, licensing, and related-form information.

Open official source →
Official source

ACORD Forms Program

Use the official source to confirm form availability, edition, jurisdiction, licensing, and related-form information.

Open official source →
Official source

ACORD eForms

Use the official source to confirm form availability, edition, jurisdiction, licensing, and related-form information.

Open official source →
Next step

Assemble the account-specific packet.

Use the class submission guide to identify the underwriting facts and Hedge forms that may apply, then have Hedge confirm the intended market and route.